7th Data Center Design, Engineering & Construction Summit

Safety Mojo at the center of the

data center conversation.

We’re a Gold Sponsor of one of the most focused data center construction gatherings in North America — chairing the full event program, contributing to the Day 1 keynote conversation on construction risk, and leading a panel on the accountability questions this industry isn’t asking loudly enough.

7th Data Center Design, Engineering & Construction Summit

Safety Mojo at the center of the

data center conversation.

We’re a Gold Sponsor of one of the most focused data center construction gatherings in North America — chairing the full event program, contributing to the Day 1 keynote conversation on construction risk, and leading a panel on the accountability questions this industry isn’t asking loudly enough.

Date

May 27–28, 2026

Venue

Sheraton Reston Hotel

Location

Ashburn, VA

Host

Future Bridge Americas

Attending the Summit?

Reach out before May 27 — Cory and Manoj will both be on site for the full two days.

Day 1 · Keynote Presentation

When safety fails on a

hyperscale build, the owner pays.

The Day 1 opening keynote tackles the question most developers in this room have avoided: what does construction risk actually cost when you own the project? This isn’t a safety lecture — it’s a financial and operational story about what happens when you treat construction risk as someone else’s problem, and what a proactive safety program built around real-time data actually changes.

1. The assumption that costs owners most

“That’s the GC’s problem.” Why that framing is the most expensive mistake a developer can make on a project where every delayed day has a dollar value.

2. The four hidden risks that kill your schedule

Trade stacking, communication failures, poor work sequencing, and planning breakdowns — the predictable outputs of a complex build under intense schedule pressure.

3. What real-time AI visibility actually changes

How one safety professional can maintain visibility across a global portfolio of active data center projects — and why end-of-day reports don’t protect your schedule.

4. Three things to do before the next project breaks ground

Practical actions for owners: what goes in the contract, what independent eyes on site are worth, and what real-time data does that a GC report doesn’t.

"Online, On-Time: How AI Helps Owners Mitigate Risk and Keep Data Center Builds On Schedule"

Owner Perspective on Construction Risk

A practitioner-led conversation on what it takes to protect schedule and contain risk on large-scale data center builds — from someone managing it at global scale.
 

Day 2 · Panel Discussion

Whose Risk Is It Anyway?

Owner, builder, and insurer. Three seats at the table with fundamentally different relationships to the same incident. This panel puts the uncomfortable questions on the table — about accountability, about what AI actually changes, and about the gap between a safety report and safety reality. Cory Linton, CEO of Safety Mojo, moderates.

Jim Thornton

VP, Global Development Safety

Prologis

 

Owner Perspective

Sam Russell

Vice President

Alliant Insurance Services

 

Insurance Perspective

Manoj Perumal

President & Co-Founder

Safety Mojo

 

AI Perspective

Andrew Hallam

Senior Project Manager

HITT Contracting

 

Builder Perspective

About the Summit

The most concentrated room of data center construction decision-makers in Northern Virginia.

The 7th Data Center Design, Engineering & Construction Summit by Future Bridge Americas brings together the C-suite and VP-level leadership building and operating next-generation data center infrastructure. Ashburn, Virginia — the data center capital of the world — is the right backdrop for two days of serious conversation about what it actually takes to deliver these projects.

300 +

Attendees

50 +

Speakers

2

Days

Selected Discussion Questions — What the panel will tackle

Risk & Cost

What does a serious incident on a hyperscale project actually cost when you add everything up — stoppages, claims, litigation, remobilization? And what does it cost in time on a project where every week of delay has a contractual consequence?

AI in the Field

What’s the version of AI in construction safety that’s actually making a difference today — not in a pilot, not in a brochure, but on an active hyperscale build? What drives field adoption at scale — and what kills it fastest?

Underwriting

An owner walks in with real-time AI-generated compliance data versus end-of-month GC reports. What’s the difference in how you underwrite those two risks — and what does that documentation do when something goes wrong?

Accountability

When you have data showing a contractor is underperforming in week three — not at closeout — what actually happens? How does AI-generated data change that conversation versus a verbal report?

Looking Forward

The workforce is getting less experienced at the exact moment projects are getting bigger and faster. Is AI part of how we close that gap — or is this a culture problem technology can’t solve?

Who attends

Data Center Owners & Developers

MEP Engineers

Commissioning Managers

Cloud & Hyperscale Operators

Insurance & Risk

Critical Facility Engineers

Construction Directors

Technology & Infrastructure Leaders

General Contractors

About Safety Mojo

The only safety platform mandated on hyperscale data center programs.

Safety Mojo is a safety management platform built for the complexity of large construction projects — the kind where you have dozens of trades stacking simultaneously, workforces that span two languages, and an owner who needs to know what’s happening right now, not at the end of the day.

We’ve built deep programs with the owners and GCs pushing the hardest data center construction programs in North America. Our platform is the required safety infrastructure on some of the largest hyperscale builds underway. If you’re building data centers at scale and you’re still flying blind between morning huddles, that’s a problem we can solve.

Learn more at getmojo.ai

About Safety Mojo

The only safety platform mandated on hyperscale data center programs.

Safety Mojo is a safety management platform built for the complexity of large construction projects — the kind where you have dozens of trades stacking simultaneously, workforces that span two languages, and an owner who needs to know what’s happening right now, not at the end of the day.

We’ve built deep programs with the owners and GCs pushing the hardest data center construction programs in North America. Our platform is the required safety infrastructure on some of the largest hyperscale builds underway. If you’re building data centers at scale and you’re still flying blind between morning huddles, that’s a problem we can solve.

Learn more at getmojo.ai

A Smart Safety Platform for Complex Construction Projects

Safety Mojo gives you a complete view of frontline safety, risk, and compliance.

Book Your Personalized Demo

Let's Get Started

Send us a message and we`ll respond as soon as possible

*” indicates required fields